ITAC Assessment: OK0908
ITAC logo
ITAC Assessment: OK0908
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Polyester gel coatings
NAICS 325510: Paint and Coating Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 82,000
ft2
Annual Production 19,000,000
lb
Production Hrs. Annual 3,375
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,059 970,880
kWh
Electricity Demand $50,261 5,934
kW-mo/yr
Natural Gas $24,647 2,818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $6,429 $11,430 $6,429 -
02 2.8121: Apply for tax-free status for energy purchases $3,662 $120 $3,662 -
03 2.1233: Analyze flue gas for proper air/fuel ratio $621 $432 - $621
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $7,829 $59,743 - $7,829
-
MMBtu
TOTAL RECOMMENDED $18,541 $71,725 $10,091 $8,450
-
MMBtu
TOTAL IMPLEMENTED $7,050 $11,862 $6,429 $621
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs