Assessment Year | 2014 |
---|---|
Principal Product | Aircraft composites manufacturing |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
140,000
ft2
|
Annual Production | 765
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $225,737 | 3,965,593 |
kWh
|
$0.057 |
Electricity Demand | $116,777 | 10,540 |
kW-mo/yr
|
$11.08 |
Natural Gas | $92,552 | 16,794 |
MMBtu
|
$5.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,583 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,233 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $15,746 | $14,500 |
$15,746
276,250
kWh
|
- | - | - | |
02 | 2.2691: Shut off cooling if cold outside air will cool process | $4,415 | $7,547 |
$1,877
32,931
kWh
|
$2,538
-
kW-mo/yr
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $10,189 | $4,650 |
$6,139
107,708
kWh
|
- | - |
$4,050
-
MMBtu
|
|
04 | 2.5122: Replace high resistance ducts, pipes, and fittings | $4,444 | $6,994 |
$1,913
33,565
kWh
|
$2,531
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,519 | $5,372 |
$994
17,432
kWh
|
$526
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $200 | $696 |
$200
3,513
kWh
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,946 | $320 |
$1,946
34,137
kWh
|
- | - | - | |
08 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $815 | $250 | - | - | - |
$815
-
MMBtu
|
|
09 | 2.2136: Install / repair insulation on steam lines | $1,124 | $239 |
$1,124
19,721
kWh
|
- | - | - | |
10 | 2.4131: Size electric motors for peak operating efficiency | $2,920 | $10,599 |
$2,920
51,224
kWh
|
- | - | - | |
11 | 2.3212: Optimize plant power factor | $4,264 | $2,925 | - | - | $4,264 | - | |
TOTAL RECOMMENDED | $47,583 | $54,092 |
$32,859
576,481
kWh
|
$5,595
-
kW-mo/yr
|
$4,264 |
$4,865
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,233 | $15,488 |
$10,183
178,653
kWh
|
- | - |
$4,050
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs