Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Tractor trailer hubs and brake drums
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 41
Plant Area 250,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 3,600
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,390 2,851,200
kWh
Electricity Demand $147,069 15,084
kW-mo/yr
Natural Gas $17,387 2,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $10,088 $12,319 $6,929
135,864
kWh
$3,159
-
kW-mo/yr
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $42,502 $2,889 $20,857
408,960
kWh
$21,645
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,111 $1,900 $2,111
41,400
kWh
-
TOTAL RECOMMENDED $54,701 $17,108 $29,897
586,224
kWh
$24,804
-
kW-mo/yr
TOTAL IMPLEMENTED $54,701 $17,108 $29,897
586,224
kWh
$24,804
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs