Assessment Year | 2014 |
---|---|
Principal Product | Steel and fiberglass tanks |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
110,202
ft2
|
Annual Production | 1,520
pieces
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $134,479 | 1,555,171 |
kWh
|
$0.086 |
Electricity Demand | $39,945 | 8,411 |
kW-mo/yr
|
$4.75 |
Natural Gas | $31,416 | 6,453 |
MMBtu
|
$4.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,106 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,207 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7211: Clean and maintain refrigerant condensers and towers | $380 | $112 |
$343
3,986
kWh
|
$37
-
kW-mo/yr
|
- | |
02 | 2.6124: Establish equipment maintenance schedule | $3,364 | $1,568 | - | - |
$3,364
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $1,682 | - | - | - |
$1,682
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,847 | $980 |
$13,847
161,010
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,899 | $21,005 |
$12,899
149,997
kWh
|
- | - | |
06 | 2.6127: Maintain air filters by cleaning or replacement | $934 | $1,024 |
$934
10,862
kWh
|
- | - | |
TOTAL RECOMMENDED | $33,106 | $24,689 |
$28,023
325,855
kWh
|
$37
-
kW-mo/yr
|
$5,046
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,207 | $3,684 |
$15,124
175,858
kWh
|
$37
-
kW-mo/yr
|
$5,046
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs