ITAC Assessment: OK0874
ITAC logo
ITAC Assessment: OK0874
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Steel and fiberglass tanks
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 110,202
ft2
Annual Production 1,520
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,479 1,555,171
kWh
Electricity Demand $39,945 8,411
kW-mo/yr
Natural Gas $31,416 6,453
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $380 $112 $343
3,986
kWh
$37
-
kW-mo/yr
-
02 2.6124: Establish equipment maintenance schedule $3,364 $1,568 - - $3,364
-
MMBtu
03 2.2437: Recover waste heat from equipment $1,682 - - - $1,682
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,847 $980 $13,847
161,010
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,899 $21,005 $12,899
149,997
kWh
- -
06 2.6127: Maintain air filters by cleaning or replacement $934 $1,024 $934
10,862
kWh
- -
TOTAL RECOMMENDED $33,106 $24,689 $28,023
325,855
kWh
$37
-
kW-mo/yr
$5,046
-
MMBtu
TOTAL IMPLEMENTED $20,207 $3,684 $15,124
175,858
kWh
$37
-
kW-mo/yr
$5,046
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs