Assessment Year | 2013 |
---|---|
Principal Product | Oil field storage tanks and trailers |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
322,600
ft2
|
Annual Production | 600
pieces
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $117,048 | 1,745,245 |
kWh
|
$0.067 |
Electricity Demand | $104,905 | 9,797 |
kW-mo/yr
|
$10.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,507 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,274 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $20,741 | - |
$20,741
309,560
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,100 | $4,500 |
$6,100
91,047
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,511 | $6,889 |
$3,511
52,408
kWh
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $2,477 | $6,160 |
$2,477
36,971
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,151 | $5,376 |
$714
10,659
kWh
|
$437
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,981 | $15,725 |
$2,811
41,960
kWh
|
$1,170
-
kW-mo/yr
|
|
07 | 2.7211: Clean and maintain refrigerant condensers and towers | $546 | $540 |
$138
2,067
kWh
|
$408
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $38,507 | $39,190 |
$36,492
544,672
kWh
|
$2,015
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $10,274 | $16,576 |
$9,429
140,744
kWh
|
$845
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs