Assessment Year | 2012 |
---|---|
Principal Product | Pipings and tubings |
NAICS | 333996: Fluid Power Pump and Motor Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $5 M to 10M |
# of Employees | 161 |
Plant Area |
400,000
ft2
|
Annual Production | 2,376,573
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $528,513 | 9,723,000 |
kWh
|
$0.054 |
Natural Gas | $341,554 | 57,116 |
MMBtu
|
$5.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $167,429 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,222 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $17,696 | $22,166 | - |
$17,696
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,396 | $2,500 |
$4,396
87,929
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $922 | $2,975 |
$922
18,438
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $5,300 | $16,148 | - |
$5,300
-
MMBtu
|
|
05 | 2.7234: Use heat pump for space conditioning | $139,115 | $1,292,500 |
$50,958
1,019,165
kWh
|
$88,157
-
MMBtu
|
|
TOTAL RECOMMENDED | $167,429 | $1,336,289 |
$56,276
1,125,532
kWh
|
$111,153
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,222 | $19,123 |
$922
18,438
kWh
|
$5,300
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs