ITAC Assessment: OK0820
ITAC logo
ITAC Assessment: OK0820
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Food serving equipments and cabinets
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 320
Plant Area 500,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,500
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,063 3,706,960
kWh
Natural Gas $47,593 5,898
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $16,400 $24,800 - $16,400
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $35,642 $42,504 $35,642
478,411
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,502 $19,152 $7,502
100,700
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,500 $16,200 $16,500
221,000
kWh
-
05 2.4133: Use most efficient type of electric motors $9,300 $10,250 $9,300
125,000
kWh
-
TOTAL RECOMMENDED $85,344 $112,906 $68,944
925,111
kWh
$16,400
-
MMBtu
TOTAL IMPLEMENTED $16,500 $16,200 $16,500
221,000
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs