ITAC Assessment: OK0814
ITAC logo
ITAC Assessment: OK0814
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Couplings and adapters
NAICS 332510: Hardware Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 212
Plant Area 140,117
ft2
Annual Production 1,831
ton
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $434,646 6,068,480
kWh
Natural Gas $130,245 22,656
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,845,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,822,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $262,832 $1,710,000 $20,142
281,320
kWh
- $242,690
02 2.4322: Use or replace with energy efficient substitutes $189,220 $20,000 $7,220
100,838
kWh
- $182,000
03 4.445: Install equipment to move product $1,364,602 $235,960 $(-7,846.0)
(-109,587)
kWh
- $1,372,448
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,049 $15,319 $6,049
84,489
kWh
- -
05 2.1133: Adjust burners for efficient operation $23,113 $11,400 - $23,113
-
MMBtu
-
TOTAL RECOMMENDED $1,845,816 $1,992,679 $25,565
357,060
kWh
$23,113
-
MMBtu
$1,797,138
TOTAL IMPLEMENTED $1,822,703 $1,981,279 $25,565
357,060
kWh
- $1,797,138
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs