ITAC Assessment: LE0549
ITAC logo
ITAC Assessment: LE0549
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aluminium Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 275,000
ft2
Annual Production 1,460,000,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,245 4,698,875
kWh
Electricity Demand $36,726 9,225
kW-mo/yr
Electricity Fees $48,007 -
Natural Gas $78,619 7,657
MMBtu
TOTAL YEARLY COSTS $393,597
RECOMMENDED SAVINGS* $49,732 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,236 $2,600 $4,712
96,173
kWh
$524
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $2,466 $8,000 $2,219
45,291
kWh
$247
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $251 $1,200 $195
3,975
kWh
$56
-
kW-mo/yr
- -
04 2.7232: Replace existing hvac unit with high efficiency model $7,374 $56,502 $(-713.0)
(-14,557)
kWh
$(-80.0)
-
kW-mo/yr
$8,167
-
MMBtu
-
05 2.9114: Use solar heat to make electricty $34,405 $420,000 $18,529
378,146
kWh
- - $15,876
TOTAL RECOMMENDED $49,732 $488,302 $24,942
509,028
kWh
$747
-
kW-mo/yr
$8,167
-
MMBtu
$15,876
TOTAL IMPLEMENTED $15,327 $68,302 $6,413
130,882
kWh
$747
-
kW-mo/yr
$8,167
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs