| Assessment Year | 2011 |
|---|---|
| Principal Product | Oil country tubular goods |
| NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $100 M to 500M |
| # of Employees | 170 |
| Plant Area |
3,284,424
ft2
|
| Annual Production | 65,000
ton
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $708,660 | 9,881,400 |
kWh
|
$0.072 |
| Electricity Demand | $199,902 | 30,993 |
kW-mo/yr
|
$6.45 |
| Natural Gas | $1,008,778 | 206,716 |
MMBtu
|
$4.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $247,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $104,341 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $116,318 | $187,782 | - | - |
$116,318
-
MMBtu
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $52,531 | $65,527 |
$52,531
750,456
kWh
|
- | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,048 | $6,145 |
$5,048
72,116
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,656 | $11,978 |
$1,656
23,658
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,469 | $7,737 |
$1,469
20,987
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,231 | $64,515 |
$14,231
203,302
kWh
|
- | - | - | |
| 07 | 2.3212: Optimize plant power factor | $19,954 | $13,110 | - |
$19,954
-
kW-mo/yr
|
- | - | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,672 | $990 |
$6,672
95,314
kWh
|
- | - | - | |
| 09 | 2.2511: Insulate bare equipment | $1,037 | $190 | - | - |
$1,037
-
MMBtu
|
- | |
| 10 | 3.1191: Change procedures / equipment / operating conditions | $19,937 | $8,250 | - | - |
$19,937
-
MMBtu
|
- | |
| 11 | 3.1191: Change procedures / equipment / operating conditions | $8,447 | $25,472 | - | - | - | $8,447 | |
| TOTAL RECOMMENDED | $247,300 | $391,696 |
$81,607
1,165,833
kWh
|
$19,954
-
kW-mo/yr
|
$137,292
-
MMBtu
|
$8,447 | ||
| TOTAL IMPLEMENTED | $104,341 | $177,541 |
$74,903
1,070,059
kWh
|
$19,954
-
kW-mo/yr
|
$1,037
-
MMBtu
|
$8,447 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs