ITAC Assessment: OK0813
ITAC logo
ITAC Assessment: OK0813
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Oil country tubular goods
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $100
M
to 500
M
# of Employees 170
Plant Area 3,284,424
ft2
Annual Production 65,000
ton
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $708,660 9,881,400
kWh
Electricity Demand $199,902 30,993
kW-mo/yr
Natural Gas $1,008,778 206,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $247,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,341

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $116,318 $187,782 - - $116,318
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,531 $65,527 $52,531
750,456
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,048 $6,145 $5,048
72,116
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,656 $11,978 $1,656
23,658
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,469 $7,737 $1,469
20,987
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,231 $64,515 $14,231
203,302
kWh
- - -
07 2.3212: Optimize plant power factor $19,954 $13,110 - $19,954
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,672 $990 $6,672
95,314
kWh
- - -
09 2.2511: Insulate bare equipment $1,037 $190 - - $1,037
-
MMBtu
-
10 3.1191: Change procedures / equipment / operating conditions $19,937 $8,250 - - $19,937
-
MMBtu
-
11 3.1191: Change procedures / equipment / operating conditions $8,447 $25,472 - - - $8,447
TOTAL RECOMMENDED $247,300 $391,696 $81,607
1,165,833
kWh
$19,954
-
kW-mo/yr
$137,292
-
MMBtu
$8,447
TOTAL IMPLEMENTED $104,341 $177,541 $74,903
1,070,059
kWh
$19,954
-
kW-mo/yr
$1,037
-
MMBtu
$8,447
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs