Assessment Year | 2010 |
---|---|
Principal Product | A/C Copmressor Parts |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 84 |
Plant Area |
158,675
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $162,895 | 2,088,300 |
kWh
|
$0.078 |
Natural Gas | $5,253 | 498 |
MMBtu
|
$10.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,664 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,004 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $10,533 | $32,670 |
$13,233
169,654
kWh
|
$(-2,700.0) | |
02 | 2.7211: Clean and maintain refrigerant condensers and towers | $4,667 | $2,700 |
$4,667
59,844
kWh
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $209 | $334 |
$209
2,674
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $860 | $1,865 |
$860
11,025
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,134 | $706 |
$1,134
14,171
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,134 | $1,678 |
$1,134
14,547
kWh
|
- | |
07 | 2.3192: Use fossil fuel powered generator during peak demand periods | $3,127 | - |
$3,127
-
kWh
|
- | |
TOTAL RECOMMENDED | $21,664 | $39,953 |
$24,364
271,915
kWh
|
$(-2,700.0) | ||
TOTAL IMPLEMENTED | $8,004 | $7,283 |
$8,004
102,261
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs