ITAC Assessment: OK0757
ITAC logo
ITAC Assessment: OK0757
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product printing
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range less than $500
k
# of Employees 104
Plant Area 61,000
ft2
Annual Production 17,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,927 2,711,400
kWh
Natural Gas $7,801 669
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $2,747 $1,256 $2,747
35,681
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $14,252 $7,032 $14,252
185,099
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $17,400 $39,500 $17,400
225,969
kWh
-
04 4.812: Apply for investment incentives $9,419 - $9,419
1,260,000
kWh
-
05 2.2437: Recover waste heat from equipment $5,133 $4,638 - $5,133
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $958 $1,214 $958
12,439
kWh
-
TOTAL RECOMMENDED $49,909 $53,640 $44,776
1,719,188
kWh
$5,133
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs