ITAC Assessment: OK0737
ITAC logo
ITAC Assessment: OK0737
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product PVC Resin
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 500,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $907,992 133,150
kWh
Electricity Demand $333,533 62,512
kW-mo/yr
Natural Gas $3,996,595 202,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $181,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2163: Use minimum steam operating pressure $22,707 $1,420 - - $22,707
-
MMBtu
02 2.2121: Increase amount of condensate returned $7,798 $11,625 - - $7,798
-
MMBtu
03 2.2113: Repair or replace steam traps $92,687 $1,025 - - $92,687
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $30,440 $19,260 $23,884
628,530
kWh
$6,556
-
kW-mo/yr
-
05 2.2611: Moderate cooling tower outlet temperature $28,248 $15,000 $28,248
743,374
kWh
- -
TOTAL RECOMMENDED $181,880 $48,330 $52,132
1,371,904
kWh
$6,556
-
kW-mo/yr
$123,192
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs