ITAC Assessment: OK0734
ITAC logo
ITAC Assessment: OK0734
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aerospace components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 126,000
ft2
Annual Production 53,000,000
pieces
Production Hrs. Annual 6,656
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $330,749 6,681,349
kWh
Electricity Demand $209,433 26,371
kW-mo/yr
Natural Gas $273,191 29,542
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,954 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,855

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $25,049 $15,000 - $25,049
-
kW-mo/yr
-
02 2.7241: Install outside air damper / economizer on hvac unit $33,532 $47,764 $33,532
670,634
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $7,323 $5,175 $7,323
146,479
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $219 $1,290 $219
4,387
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,594 $1,150 $1,226
24,528
kWh
$267
-
kW-mo/yr
$3,101
06 2.7135: Install occupancy sensors $237 $1,013 $237
4,742
kWh
- -
07 2.4151: Develop a repair/replace policy $3,000 $500 $3,000
60,000
kWh
- -
TOTAL RECOMMENDED $73,954 $71,892 $45,537
910,770
kWh
$25,316
-
kW-mo/yr
$3,101
TOTAL IMPLEMENTED $43,855 $53,439 $43,855
877,113
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs