Assessment Year | 2005 |
---|---|
Principal Product | Aircraft Turbine Repair |
NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
125,000
ft2
|
Annual Production | 120,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $188,204 | 7,424,000 |
kWh
|
$0.025 |
Electricity Demand | $128,827 | 19,418 |
kW-mo/yr
|
$6.63 |
Electricity Fees | $90,768 | - |
|
- |
Natural Gas | $102,653 | 14,687 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $3,938 | $3,936 |
$2,821
111,072
kWh
|
$1,117
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,111 | $918 |
$5,018
197,551
kWh
|
$1,093
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,522 | $5,175 |
$2,522
99,308
kWh
|
- | - | |
04 | 2.6224: Schedule baking times of small and large components | $804 | $1,825 | - | - |
$804
-
MMBtu
|
|
05 | 2.7241: Install outside air damper / economizer on hvac unit | $7,665 | $47,100 |
$7,665
301,786
kWh
|
- | - | |
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,022 | $608 |
$1,022
18,611
kWh
|
- | - | |
07 | 2.2628: Utilize a less expensive cooling method | $472 | $1,000 |
$472
18,574
kWh
|
- | - | |
08 | 2.1321: Replace fossil fuel equipment with electrical equipment | $5,361 | $26,590 | - | - |
$5,361
-
MMBtu
|
|
09 | 2.7221: Lower temperature during the winter season and vice-versa | $20,968 | - | - | - |
$20,968
-
MMBtu
|
|
TOTAL RECOMMENDED | $48,863 | $87,152 |
$19,520
746,902
kWh
|
$2,210
-
kW-mo/yr
|
$27,133
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs