Assessment Year | 2005 |
---|---|
Principal Product | Business forms |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 143 |
Plant Area |
110,000
ft2
|
Annual Production | 312,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,553 | 3,858,984 |
kWh
|
$0.048 |
Electricity Demand | $38,486 | 8,458 |
kW-mo/yr
|
$4.55 |
Electricity Fees | $207 | - |
|
- |
Natural Gas | $21,780 | 2,393 |
MMBtu
|
$9.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $78,032 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $69,232 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,172 | $6,087 |
$157
3,259
kWh
|
$55
-
kW-mo/yr
|
- | $3,960 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,394 | $6,700 |
$3,521
73,192
kWh
|
$873
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,314 | $1,327 |
$6,322
131,431
kWh
|
$2,192
-
kW-mo/yr
|
- | $(-200.0) | - | |
04 | 4.611: Begin a practice of predictive / preventative maintenance | $8,800 | - | - | - | - | $8,800 | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $37,832 | $13,050 |
$37,832
786,530
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,450 | $26,280 |
$7,011
145,766
kWh
|
$2,439
-
kW-mo/yr
|
- | - | - | |
07 | 3.5217: Reuse / recycle/ sell paper products | $5,070 | $700 | - | - |
$2,080
-
lb
|
$(-2,600.0) | $5,590 | |
TOTAL RECOMMENDED | $78,032 | $54,144 |
$54,843
1,140,178
kWh
|
$5,559
-
kW-mo/yr
|
$2,080
-
lb
|
$9,960 | $5,590 | ||
TOTAL IMPLEMENTED | $69,232 | $54,144 |
$54,843
1,140,178
kWh
|
$5,559
-
kW-mo/yr
|
$2,080
-
lb
|
$1,160 | $5,590 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs