ITAC Assessment: OK0701
ITAC logo
ITAC Assessment: OK0701
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Injection Molded Products
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 58,000
ft2
Annual Production 37,960
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,879 4,016,800
kWh
Electricity Demand $73,039 7,613
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 4.514: Re-arrange equipment layout to reduce handling costs $11,182 $123,420 - - $11,182
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,527 $3,807 $5,254
170,571
kWh
$2,273
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $43,354 $1,623 $30,257
982,942
kWh
$13,097
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,396 $8,850 $3,069
99,643
kWh
$1,327
-
kW-mo/yr
-
05 2.2612: Use cooling tower water instead of refrigeration $19,082 $13,500 $11,351
465,932
kWh
$7,731
-
kW-mo/yr
-
06 2.2623: Minimize condenser cooling water temperature $4,169 $275 $2,898
93,996
kWh
$1,271
-
kW-mo/yr
-
TOTAL RECOMMENDED $89,710 $151,475 $52,829
1,813,084
kWh
$25,699
-
kW-mo/yr
$11,182
TOTAL IMPLEMENTED $58,932 $133,893 $33,326
1,082,585
kWh
$14,424
-
kW-mo/yr
$11,182
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs