| Assessment Year | 2004 |
|---|---|
| Principal Product | Injection Molded Products |
| NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
| SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
58,000
ft2
|
| Annual Production | 37,960
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $123,879 | 4,016,800 |
kWh
|
$0.031 |
| Electricity Demand | $73,039 | 7,613 |
kW-mo/yr
|
$9.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $89,710 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $58,932 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.514: Re-arrange equipment layout to reduce handling costs | $11,182 | $123,420 | - | - | $11,182 | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,527 | $3,807 |
$5,254
170,571
kWh
|
$2,273
-
kW-mo/yr
|
- | |
| 03 | 2.2511: Insulate bare equipment | $43,354 | $1,623 |
$30,257
982,942
kWh
|
$13,097
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,396 | $8,850 |
$3,069
99,643
kWh
|
$1,327
-
kW-mo/yr
|
- | |
| 05 | 2.2612: Use cooling tower water instead of refrigeration | $19,082 | $13,500 |
$11,351
465,932
kWh
|
$7,731
-
kW-mo/yr
|
- | |
| 06 | 2.2623: Minimize condenser cooling water temperature | $4,169 | $275 |
$2,898
93,996
kWh
|
$1,271
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $89,710 | $151,475 |
$52,829
1,813,084
kWh
|
$25,699
-
kW-mo/yr
|
$11,182 | ||
| TOTAL IMPLEMENTED | $58,932 | $133,893 |
$33,326
1,082,585
kWh
|
$14,424
-
kW-mo/yr
|
$11,182 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs