ITAC Assessment: OK0687
ITAC logo
ITAC Assessment: OK0687
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Portion Control Meats
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 12,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,811 1,662,410
kWh
Electricity Demand $40,865 4,654
kW-mo/yr
Electricity Fees $20,576 -
Natural Gas $13,030 1,477
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,853 $8,000 - $7,853
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,548 $825 $537
6,290
kWh
$76
-
kW-mo/yr
$1,200 $1,735
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,490 $5,298 $1,490
17,468
kWh
- - -
04 2.7135: Install occupancy sensors $1,980 $269 $1,980
23,213
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,199 $287 $790
9,266
kWh
$18
-
kW-mo/yr
- $391
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,275 $8,882 $2,482
29,097
kWh
$495
-
kW-mo/yr
- $(-702.0)
TOTAL RECOMMENDED $18,345 $23,561 $7,279
85,334
kWh
$8,442
-
kW-mo/yr
$1,200 $1,424
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs