ITAC Assessment: OK0680
ITAC logo
ITAC Assessment: OK0680
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Plastic Cups and Plates
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 265,200
ft2
Annual Production 10,200,000
pieces
Production Hrs. Annual 8,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,472,064 39,962,400
kWh
Natural Gas $38,149 5,405
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,607 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,978

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,584 $52,597 $19,311
524,768
kWh
- - - $3,273 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,824 $980 $170
4,608
kWh
- $531 - $2,123 -
03 2.6232: Install set-back timers $26,433 $1,100 - $26,433
-
MMBtu
- - - -
04 2.1121: Use insulation in furnaces to facilitate heating / cooling $19,697 $15,783 n/a - $19,697
-
MMBtu
- - - -
05 4.132: Purchase new equipment to reduce material use / cost $3,154 $590 - - - $3,154 - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,427 $28,713 $21,427
582,253
kWh
- - - - -
07 2.5123: Reduce fluid flow rates $38,434 $27,594 $38,434
1,044,400
kWh
- - - - -
08 2.7135: Install occupancy sensors $945 $479 $945
25,728
kWh
- - - - -
09 3.4141: Replace the chlorination stage with an oxygen or ozone stage $9,109 $36,000 $(-618.0)
(-16,781)
kWh
- - - - $9,727
-
Tgal
TOTAL RECOMMENDED $144,607 $163,836 $79,669
2,164,976
kWh
$46,130
-
MMBtu
$531 $3,154 $5,396 $9,727
-
Tgal
TOTAL IMPLEMENTED $5,978 $1,570 $170
4,608
kWh
- $531 $3,154 $2,123 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs