Assessment Year | 2004 |
---|---|
Principal Product | Plastic Cups and Plates |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
265,200
ft2
|
Annual Production | 10,200,000
pieces
|
Production Hrs. Annual | 8,000
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,472,064 | 39,962,400 |
kWh
|
$0.037 |
Natural Gas | $38,149 | 5,405 |
MMBtu
|
$7.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $144,607 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,978 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,584 | $52,597 |
$19,311
524,768
kWh
|
- | - | - | $3,273 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,824 | $980 |
$170
4,608
kWh
|
- | $531 | - | $2,123 | - | |
03 | 2.6232: Install set-back timers | $26,433 | $1,100 | - |
$26,433
-
MMBtu
|
- | - | - | - | |
04 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $19,697 | $15,783 | n/a | - |
$19,697
-
MMBtu
|
- | - | - | - |
05 | 4.132: Purchase new equipment to reduce material use / cost | $3,154 | $590 | - | - | - | $3,154 | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,427 | $28,713 |
$21,427
582,253
kWh
|
- | - | - | - | - | |
07 | 2.5123: Reduce fluid flow rates | $38,434 | $27,594 |
$38,434
1,044,400
kWh
|
- | - | - | - | - | |
08 | 2.7135: Install occupancy sensors | $945 | $479 |
$945
25,728
kWh
|
- | - | - | - | - | |
09 | 3.4141: Replace the chlorination stage with an oxygen or ozone stage | $9,109 | $36,000 |
$(-618.0)
(-16,781)
kWh
|
- | - | - | - |
$9,727
-
Tgal
|
|
TOTAL RECOMMENDED | $144,607 | $163,836 |
$79,669
2,164,976
kWh
|
$46,130
-
MMBtu
|
$531 | $3,154 | $5,396 |
$9,727
-
Tgal
|
||
TOTAL IMPLEMENTED | $5,978 | $1,570 |
$170
4,608
kWh
|
- | $531 | $3,154 | $2,123 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs