ITAC Assessment: OK0674
ITAC logo
ITAC Assessment: OK0674
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Galvanized Steel Products
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 30,000
ft2
Annual Production 8,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,708 567,447
kWh
Electricity Fees $1,807 -
Natural Gas $364,342 77,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $16,662 $13,792 $2,744
62,067
kWh
$13,918
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $748 - $748
16,725
kWh
- - -
03 4.611: Begin a practice of predictive / preventative maintenance $3,400 - - - - $3,400
04 4.632: Change operating conditions $28,500 $40,604 - - $(-750.0)
-
MMBtu
$29,250
05 2.7135: Install occupancy sensors $143 $184 $143
3,195
kWh
- - -
TOTAL RECOMMENDED $49,453 $54,580 $3,635
81,987
kWh
$13,918
-
MMBtu
$(-750.0)
-
MMBtu
$32,650
TOTAL IMPLEMENTED $16,662 $13,792 $2,744
62,067
kWh
$13,918
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs