Assessment Year | 2003 |
---|---|
Principal Product | Thrust Reversers, Nacelles |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
375,000
ft2
|
Annual Production | 216
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $299,579 | 12,065,200 |
kWh
|
$0.025 |
Electricity Demand | $169,901 | 39,975 |
kW-mo/yr
|
$4.25 |
Electricity Fees | $44,104 | - |
|
- |
Natural Gas | $65,945 | 11,105 |
MMBtu
|
$5.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,851 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,885 | $6,844 | - |
$5,885
-
kW-mo/yr
|
- | - | - | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $28,340 | - | - |
$28,340
-
kW-mo/yr
|
- | - | - | |
03 | 2.8121: Apply for tax-free status for energy purchases | $12,626 | $2,000 | - | - | - | $12,626 | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,333 | $145 |
$1,362
54,912
kWh
|
$971
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,041 | - |
$1,041
41,933
kWh
|
- | - | - | - | |
06 | 2.3212: Optimize plant power factor | $1,292 | $8,190 | - | - | - | $1,292 | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $7,225 | $262 | - | - |
$7,225
-
Tgal
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,952 | $28,902 |
$3,719
149,760
kWh
|
$2,648
-
kW-mo/yr
|
- | - | $(-415.0) | |
09 | 2.7135: Install occupancy sensors | $578 | $488 |
$578
23,296
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $65,272 | $46,831 |
$6,700
269,901
kWh
|
$37,844
-
kW-mo/yr
|
$7,225
-
Tgal
|
$13,918 | $(-415.0) | ||
TOTAL IMPLEMENTED | $19,851 | $2,262 | - | - |
$7,225
-
Tgal
|
$12,626 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs