ITAC Assessment: OK0672
ITAC logo
ITAC Assessment: OK0672
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Thrust Reversers, Nacelles
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 375,000
ft2
Annual Production 216
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,579 12,065,200
kWh
Electricity Demand $169,901 39,975
kW-mo/yr
Electricity Fees $44,104 -
Natural Gas $65,945 11,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,885 $6,844 - $5,885
-
kW-mo/yr
- - -
02 2.3132: Recharge batteries on during off-peak demand periods $28,340 - - $28,340
-
kW-mo/yr
- - -
03 2.8121: Apply for tax-free status for energy purchases $12,626 $2,000 - - - $12,626 -
04 2.7111: Reduce illumination to minimum necessary levels $2,333 $145 $1,362
54,912
kWh
$971
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,041 - $1,041
41,933
kWh
- - - -
06 2.3212: Optimize plant power factor $1,292 $8,190 - - - $1,292 -
07 3.4116: Meter recycled water (to reduce sewer charges) $7,225 $262 - - $7,225
-
Tgal
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,952 $28,902 $3,719
149,760
kWh
$2,648
-
kW-mo/yr
- - $(-415.0)
09 2.7135: Install occupancy sensors $578 $488 $578
23,296
kWh
- - - -
TOTAL RECOMMENDED $65,272 $46,831 $6,700
269,901
kWh
$37,844
-
kW-mo/yr
$7,225
-
Tgal
$13,918 $(-415.0)
TOTAL IMPLEMENTED $19,851 $2,262 - - $7,225
-
Tgal
$12,626 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs