ITAC Assessment: GT0211
ITAC logo
ITAC Assessment: GT0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product YARN DYEING
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 4,896
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,343 703,986
kWh
Natural Gas $194,612 45,155
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,648

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings Administrative Changes Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $19,964 $32,000 - $19,964
-
MMBtu
- -
02 2.2514: Cover open tanks $2,894 $4,000 - $2,894
-
MMBtu
- -
03 2.2135: Repair and eliminate steam leaks $300 $50 - $300
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $985 $432 - $985
-
MMBtu
- -
05 2.2122: Install / repair insulation on condensate lines $335 $148 - $335
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $808 $104 $808
16,999
kWh
- - -
07 2.1331: Burn a less expensive grade of fuel $67,362 $200,000 - $194,612
-
MMBtu
$(-116,250.0)
-
MMBtu
$(-11,000.0)
08 2.2121: Increase amount of condensate returned $1,000 $8,000 - $1,000
-
MMBtu
- -
TOTAL RECOMMENDED $93,648 $244,734 $808
16,999
kWh
$220,090
-
MMBtu
$(-116,250.0)
-
MMBtu
$(-11,000.0)
TOTAL IMPLEMENTED $93,648 $244,734 $808
16,999
kWh
$220,090
-
MMBtu
$(-116,250.0)
-
MMBtu
$(-11,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Coal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs