ITAC Assessment: OK0662
ITAC logo
ITAC Assessment: OK0662
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Piston Pins
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 103,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,283 7,501,200
kWh
Electricity Demand $162,351 31,200
kW-mo/yr
Electricity Fees $(-22,086.0) -
Natural Gas $301,645 64,050
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7226: Use computer programs to optimize hvac performance $832 $3,222 - $832
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $181 $300 $181
6,490
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,135 $3,289 $2,135
76,508
kWh
- - -
04 2.2511: Insulate bare equipment $406 $221 - - $406
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $165 $864 $192
6,864
kWh
- - $(-27.0)
06 2.7241: Install outside air damper / economizer on hvac unit $6,326 $23,100 n/a $6,326
226,740
kWh
- - -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,701 $1,011 - - $1,701
-
MMBtu
-
08 2.4131: Size electric motors for peak operating efficiency $8,730 $1,000 $4,079
146,216
kWh
$4,651
-
kW-mo/yr
- -
TOTAL RECOMMENDED $20,476 $33,007 $12,913
462,818
kWh
$5,483
-
kW-mo/yr
$2,107
-
MMBtu
$(-27.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs