| Assessment Year | 2003 |
|---|---|
| Principal Product | Piston Pins |
| NAICS | 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
103,000
ft2
|
| Annual Production | 6,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $209,283 | 7,501,200 |
kWh
|
$0.028 |
| Electricity Demand | $162,351 | 31,200 |
kW-mo/yr
|
$5.20 |
| Electricity Fees | $(-22,086.0) | - |
|
- |
| Natural Gas | $301,645 | 64,050 |
MMBtu
|
$4.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7226: Use computer programs to optimize hvac performance | $832 | $3,222 | - |
$832
-
kW-mo/yr
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $181 | $300 |
$181
6,490
kWh
|
- | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,135 | $3,289 |
$2,135
76,508
kWh
|
- | - | - | |
| 04 | 2.2511: Insulate bare equipment | $406 | $221 | - | - |
$406
-
MMBtu
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $165 | $864 |
$192
6,864
kWh
|
- | - | $(-27.0) | |
| 06 | 2.7241: Install outside air damper / economizer on hvac unit | $6,326 | $23,100 | n/a |
$6,326
226,740
kWh
|
- | - | - |
| 07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,701 | $1,011 | - | - |
$1,701
-
MMBtu
|
- | |
| 08 | 2.4131: Size electric motors for peak operating efficiency | $8,730 | $1,000 |
$4,079
146,216
kWh
|
$4,651
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $20,476 | $33,007 |
$12,913
462,818
kWh
|
$5,483
-
kW-mo/yr
|
$2,107
-
MMBtu
|
$(-27.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs