Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Poultry Processing and Packaging
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 1,540
Plant Area 99,544
ft2
Annual Production 376,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,826 15,755,161
kWh
Electricity Demand $153,978 38,148
kW-mo/yr
Electricity Fees $332,047 -
Natural Gas $558,773 133,989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $453,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,223 $640 $5,386
251,694
kWh
$1,937
-
kW-mo/yr
- $(-100.0) - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,179 $4,683 $585
27,331
kWh
$264
-
kW-mo/yr
- - $330 -
03 2.7135: Install occupancy sensors $1,247 $927 $1,247
58,292
kWh
- - - - -
04 2.2511: Insulate bare equipment $8,627 $31,408 - - $8,627
-
MMBtu
- - -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $52,195 $19,043 n/a $(-403.0)
(-18,832)
kWh
- $52,598
-
MMBtu
- - -
06 3.4156: Use flow control valves on equipment to optimize water use $7,958 $100 $55
2,586
kWh
- - - - $7,903
-
Tgal
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $49,802 $152,022 $49,802
2,327,178
kWh
- - - - -
08 4.441: Install automatic packing equipment $325,000 $625,000 n/a - - - $325,000 - -
TOTAL RECOMMENDED $453,231 $833,823 $56,672
2,648,249
kWh
$2,201
-
kW-mo/yr
$61,225
-
MMBtu
$324,900 $330 $7,903
-
Tgal
TOTAL IMPLEMENTED $16,360 $5,423 $6,026
281,611
kWh
$2,201
-
kW-mo/yr
- $(-100.0) $330 $7,903
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings