ITAC Assessment: OK0657
ITAC logo
ITAC Assessment: OK0657
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Gray and Ductile Iron
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 44,000
ft2
Annual Production 5,510
ton
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $613,052 14,158,208
kWh
Electricity Demand $368,618 9,204
kW-mo/yr
Electricity Fees $(-6,249.0) -
Natural Gas $1,239,585 82,044
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $696,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,101

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.7135: Install occupancy sensors $1,116 $722 $1,116
25,838
kWh
- - - - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,220 $25 - - $2,220
-
MMBtu
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,257 $320 $9,281
214,830
kWh
$1,176
-
kW-mo/yr
- - $(-200.0) - -
04 4.611: Begin a practice of predictive / preventative maintenance $16,000 - - - - - $18,000 $(-2,000.0) -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,814 $11,574 $16,814
344,836
kWh
- - - - - -
06 2.2515: Use optimum thickness insulation $3,894 $3,430 - - - - - $3,894 -
07 3.4116: Meter recycled water (to reduce sewer charges) $10,378 $7,500 - - - $836
-
Tgal
- - $9,542
-
Tgal
08 2.4231: Reduce the pressure of compressed air to the minimum required $11,624 $11,750 $11,624
269,087
kWh
- - - - - -
09 4.111: Add equipment/ operators to reduce production bottleneck $624,000 $10,149 - - - - $624,000 - -
TOTAL RECOMMENDED $696,303 $45,470 $38,835
854,591
kWh
$1,176
-
kW-mo/yr
$2,220
-
MMBtu
$836
-
Tgal
$641,800 $1,894 $9,542
-
Tgal
TOTAL IMPLEMENTED $24,101 $12,095 $20,905
483,917
kWh
$1,176
-
kW-mo/yr
$2,220
-
MMBtu
- $(-200.0) - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs