ITAC Assessment: OK0650
ITAC logo
ITAC Assessment: OK0650
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Calcined Petroleum Coke
NAICS
n/a
SIC 2999: Products of Petroleum and Coal, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 73
Plant Area 306,000
ft2
Annual Production 500,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,381 8,435,200
kWh
Electricity Demand $121,039 122,765
kW-mo/yr
Electricity Fees $2,764 -
Natural Gas $777,924 151,465
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,768,423 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,276

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7135: Install occupancy sensors $1,203 $1,190 $1,203
46,253
kWh
- - - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,073 $100 $3,671
141,193
kWh
$1,402
-
kW-mo/yr
- - - -
03 2.2515: Use optimum thickness insulation $56,715 $16,956 n/a - - $56,715
-
MMBtu
- - -
04 2.2442: Preheat combustion air with waste heat $133,632 $206,750 - - $133,632
-
MMBtu
- - -
05 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $4,021,800 $30,000,000 - - - - $4,021,800 -
06 4.711: Initiate a total quality management program $1,550,000 $150,000 - - - $(-50,000.0) - $1,600,000
TOTAL RECOMMENDED $5,768,423 $30,374,996 $4,874
187,446
kWh
$1,402
-
kW-mo/yr
$190,347
-
MMBtu
$(-50,000.0) $4,021,800 $1,600,000
TOTAL IMPLEMENTED $6,276 $1,290 $4,874
187,446
kWh
$1,402
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs