ITAC Assessment: OK0649
ITAC logo
ITAC Assessment: OK0649
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Sucker and pony rods, couplings, pup joints, polished rods
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 140,000
ft2
Annual Production 201,760
pieces
Production Hrs. Annual 2,110
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,847 1,602,800
kWh
Electricity Demand $34,698 -
Electricity Fees $3,600 -
Natural Gas $81,067 29,334
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $419,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,060

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,956 $3,504 $2,623
87,448
kWh
$1,333
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $104 $37 $76
2,543
kWh
$28
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $16,238 $35,000 - - $16,238
-
MMBtu
- -
04 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,706 $2,520 - - $1,706
-
MMBtu
- -
05 4.125: $397,966 $600,000 - - - $193,450 $204,516
TOTAL RECOMMENDED $419,970 $641,061 $2,699
89,991
kWh
$1,361
-
kW-mo/yr
$17,944
-
MMBtu
$193,450 $204,516
TOTAL IMPLEMENTED $4,060 $3,541 $2,699
89,991
kWh
$1,361
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs