Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Specialty Needles
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 58,650
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 4,780
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,671 3,112,280
kWh
Electricity Demand $7,004 -
Electricity Fees $12,843 -
Natural Gas $12,274 4,826
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,739 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6232: Install set-back timers $6,131 - - - $6,201
-
MMBtu
- $(-70.0) -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,120 $6,442 $1,651
25,257
kWh
$174
-
kW-mo/yr
- - - $295
03 2.7135: Install occupancy sensors $1,798 $862 $1,626
24,856
kWh
$172
-
kW-mo/yr
- - - -
04 2.7124: Make a practice of turning off lights when not needed $485 - $485
7,412
kWh
- - - - -
05 3.4116: Meter recycled water (to reduce sewer charges) $1,536 $500 - - - $1,536
-
Tgal
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $623 $1,067 $563
8,604
kWh
$60
-
kW-mo/yr
- - - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,046 $10 - - $11,046
-
MMBtu
- - -
TOTAL RECOMMENDED $23,739 $8,881 $4,325
66,129
kWh
$406
-
kW-mo/yr
$17,247
-
MMBtu
$1,536
-
Tgal
$(-70.0) $295
TOTAL IMPLEMENTED $4,541 $8,371 $3,840
58,717
kWh
$406
-
kW-mo/yr
- - - $295
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs