ITAC Assessment: OK0634
ITAC logo
ITAC Assessment: OK0634
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Maple syrup, mustard, coconut
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 234,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,864
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,500 1,719,582
kWh
Electricity Demand $43,319 4,800
kW-mo/yr
Electricity Fees $8,413 -
Natural Gas $156,867 25,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,847

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $2,496 $823 - - $2,496
-
MMBtu
- -
02 2.1212: Operate boilers on high fire setting $2,910 $4,125 - - $2,910
-
MMBtu
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,571 $6,000 - - $4,571
-
MMBtu
- -
04 2.2511: Insulate bare equipment $218 $255 - - $218
-
MMBtu
- -
05 2.7135: Install occupancy sensors $532 $282 $532
14,414
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $992 $1,679 $613
16,626
kWh
$209
-
kW-mo/yr
- $68 $102
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $216 $2,500 $152
4,120
kWh
$64
-
kW-mo/yr
- - -
08 2.4224: Upgrade controls on compressors $7,297 $1,028 $7,397
200,466
kWh
- - $(-100.0) -
09 2.2444: Use hot process fluids to preheat incoming process fluids $20,476 $1,800 - - $20,476
-
MMBtu
- -
10 2.2113: Repair or replace steam traps $33,934 $525 - - $34,184
-
MMBtu
$(-150.0) $(-100.0)
TOTAL RECOMMENDED $73,642 $19,017 $8,694
235,626
kWh
$273
-
kW-mo/yr
$64,855
-
MMBtu
$(-182.0) $2
TOTAL IMPLEMENTED $47,847 $8,435 $8,010
217,092
kWh
$209
-
kW-mo/yr
$39,808
-
MMBtu
$(-182.0) $2
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs