ITAC Assessment: OK0631
ITAC logo
ITAC Assessment: OK0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Extruded Building Materials
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 103,741
ft2
Annual Production 50,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $553,563 16,593,600
kWh
Electricity Demand $122,478 25,740
kW-mo/yr
Electricity Fees $51,254 -
Natural Gas $23,495 4,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $207,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $207,507

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,487 $400 $13,198
395,152
kWh
$2,389
-
kW-mo/yr
$(-100.0)
02 2.2511: Insulate bare equipment $13,831 $8,000 $13,831
414,108
kWh
- -
03 2.7131: Add area lighting switches $1,991 $194 $1,667
49,920
kWh
$324
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $1,478 $6,067 $1,478
174,564
kWh
- -
05 4.445: Install equipment to move product $174,720 $364,000 - - $174,720
TOTAL RECOMMENDED $207,507 $378,661 $30,174
1,033,744
kWh
$2,713
-
kW-mo/yr
$174,620
TOTAL IMPLEMENTED $207,507 $378,661 $30,174
1,033,744
kWh
$2,713
-
kW-mo/yr
$174,620
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs