ITAC Assessment: OK0587
ITAC logo
ITAC Assessment: OK0587
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Feeds
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 34,000
ft2
Annual Production 210,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,666 4,886,284
kWh
Electricity Demand $31,289 -
Electricity Fees $(-21,028.0) -
Natural Gas $91,252 29,193
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 4.444: Install system to collect scrap $20,078 $2,250 n/a - - - $20,078 - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,905 - n/a - $16,905
-
kW-mo/yr
- - - -
03 2.1332: Convert combustion equipment to burn natural gas $7,398 $31,705 n/a - - - - $7,398 -
04 2.8113: Purchase gas directly from a contract gas supplier $3,795 - n/a - - - - - $3,795
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,193 $3,150 n/a - - $2,193
-
MMBtu
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $891 $24 n/a $271
10,551
kWh
$620
-
kW-mo/yr
- - - -
07 2.2511: Insulate bare equipment $252 $1,028 n/a - $252
-
kW-mo/yr
- - - -
08 2.2511: Insulate bare equipment $250 $525 n/a - $250
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $51,762 $38,682 $271
10,551
kWh
$18,027
-
kW-mo/yr
$2,193
-
MMBtu
$20,078 $7,398 $3,795
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs