| Assessment Year | 1996 |
|---|---|
| Principal Product | Paper board |
| NAICS |
n/a
|
| SIC | 2631: Paperboard Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
269,125
ft2
|
| Annual Production | 38,432
ton
|
| Production Hrs. Annual | 7,500
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $365,549 | 15,293,377 |
kWh
|
$0.024 |
| Natural Gas | $370,954 | 167,033 |
MMBtu
|
$2.22 |
| Fuel Oil #6 | $302,459 | 131,731 |
MMBtu
|
$2.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $140,890 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $67,563 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $71,639 | $68,000 | - |
$71,639
-
MMBtu
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,504 | - |
$5,504
106,096
kWh
|
- | - | - | |
| 03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $22,269 | $15,000 | - | - | - |
$22,269
-
Tgal
|
|
| 04 | 2.4133: Use most efficient type of electric motors | $39,790 | $174,574 |
$39,790
766,999
kWh
|
- | - | - | |
| 05 | 2.2122: Install / repair insulation on condensate lines | $1,688 | $2,508 | - |
$1,066
-
MMBtu
|
$622
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $140,890 | $260,082 |
$45,294
873,095
kWh
|
$72,705
-
MMBtu
|
$622
-
MMBtu
|
$22,269
-
Tgal
|
||
| TOTAL IMPLEMENTED | $67,563 | $189,574 |
$45,294
873,095
kWh
|
- | - |
$22,269
-
Tgal
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs