ITAC Assessment: MA0371
ITAC logo
ITAC Assessment: MA0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Paper board
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 269,125
ft2
Annual Production 38,432
ton
Production Hrs. Annual 7,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $365,549 15,293,377
kWh
Natural Gas $370,954 167,033
MMBtu
Fuel Oil #6 $302,459 131,731
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $140,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,563

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Water Disposal Savings
01 2.2437: Recover waste heat from equipment $71,639 $68,000 - $71,639
-
MMBtu
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,504 - $5,504
106,096
kWh
- - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $22,269 $15,000 - - - $22,269
-
Tgal
04 2.4133: Use most efficient type of electric motors $39,790 $174,574 $39,790
766,999
kWh
- - -
05 2.2122: Install / repair insulation on condensate lines $1,688 $2,508 - $1,066
-
MMBtu
$622
-
MMBtu
-
TOTAL RECOMMENDED $140,890 $260,082 $45,294
873,095
kWh
$72,705
-
MMBtu
$622
-
MMBtu
$22,269
-
Tgal
TOTAL IMPLEMENTED $67,563 $189,574 $45,294
873,095
kWh
- - $22,269
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs