Assessment Year | 1999 |
---|---|
Principal Product | Transformers |
NAICS |
n/a
|
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
24,000
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $35,314 | 635,111 |
kWh
|
$0.056 |
Electricity Demand | $17,196 | 2,024 |
kW-mo/yr
|
$8.50 |
Natural Gas | $11,539 | 4,709 |
MMBtu
|
$2.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,463 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,001 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $662 | $1,778 |
$662
21,981
kWh
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,195 | $331 |
$2,195
39,859
kWh
|
- | - | - | - | |
03 | 3.5313: Increase amount of waste recovered for resale | $1,000 | - | - | - | - |
$1,000
-
lb
|
- | |
04 | 2.7144: Install spectral reflectors / delamp | $163 | $248 |
$163
5,569
kWh
|
- | - | - | - | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $6,842 | - | - | - | $6,842 | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,001 | $300 |
$907
31,360
kWh
|
$1,094
-
kW-mo/yr
|
- | - | - | |
07 | 4.425: Eliminate/reduce redundant inspections | $30,600 | $15,000 | - | - | - | - | $30,600 | |
TOTAL RECOMMENDED | $43,463 | $17,657 |
$3,927
98,769
kWh
|
$1,094
-
kW-mo/yr
|
$6,842 |
$1,000
-
lb
|
$30,600 | ||
TOTAL IMPLEMENTED | $3,001 | $300 |
$907
31,360
kWh
|
$1,094
-
kW-mo/yr
|
- |
$1,000
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs