| Assessment Year | 1999 |
|---|---|
| Principal Product | Drilling Tools |
| NAICS |
n/a
|
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | n/a |
| # of Employees | 300 |
| Plant Area |
240,000
ft2
|
| Annual Production | 23,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $467,532 | 14,842,321 |
kWh
|
$0.031 |
| Electricity Demand | $182,863 | - |
|
- |
| Electricity Fees | $(-34,324.0) | - |
|
- |
| Natural Gas | $155,359 | 40,685 |
MMBtu
|
$3.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $150,623 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $137,541 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,785 | $300 |
$1,323
108,148
kWh
|
$3,462
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $3,381 | $2,100 |
$935
76,495
kWh
|
$2,446
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7135: Install occupancy sensors | $934 | $1,524 |
$934
29,015
kWh
|
- | - | - | - | |
| 04 | 4.322: Eliminate old stock and modify inventory control | $129,375 | - | - | - | - | $129,375 | - | |
| 05 | 4.211: Consider use / purchase of bulk materials where possible | $6,000 | - | - | - | - | - | $6,000 | |
| 06 | 3.6124: Burn waste oil for heat | $6,148 | $10,470 | - | - |
$6,148
-
gal
|
- | - | |
| TOTAL RECOMMENDED | $150,623 | $14,394 |
$3,192
213,658
kWh
|
$5,908
-
kW-mo/yr
|
$6,148
-
gal
|
$129,375 | $6,000 | ||
| TOTAL IMPLEMENTED | $137,541 | $2,400 |
$2,258
184,643
kWh
|
$5,908
-
kW-mo/yr
|
- | $129,375 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs