ITAC Assessment: OK0560
ITAC logo
ITAC Assessment: OK0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wellhead equipment, gate valves
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 144
Plant Area 125,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,680
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,839 3,741,208
kWh
Electricity Demand $78,787 8,570
kW-mo/yr
Electricity Fees $6,300 -
Natural Gas $46,450 11,062
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,103

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $329 $1,158 $228
7,913
kWh
$101
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,641 $12,354 $1,446
50,410
kWh
$1,195
-
kW-mo/yr
- - -
03 4.424: Improve space comfort conditioning $84,000 $330,000 - - - $84,000 -
04 2.1332: Convert combustion equipment to burn natural gas $6,750 $59,000 - - - - $6,750
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $23,508 $27,000 - $23,508
-
kW-mo/yr
- - -
06 2.2437: Recover waste heat from equipment $2,039 $7,452 $2,039
112,837
kWh
- - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $7,882 - - - $7,882
-
lb
- -
08 3.5316: Contract a wood pallet recycling company $6,735 - - - $6,735
-
lb
- -
TOTAL RECOMMENDED $133,884 $436,964 $3,713
171,160
kWh
$24,804
-
kW-mo/yr
$14,617
-
lb
$84,000 $6,750
TOTAL IMPLEMENTED $93,103 $338,610 $2,267
120,750
kWh
$101
-
kW-mo/yr
$6,735
-
lb
$84,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs