ITAC Assessment: OK0558
ITAC logo
ITAC Assessment: OK0558
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Coatings
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 100,000
ft2
Annual Production 2,000
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,328 713,951
kWh
Natural Gas $16,743 3,261
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $251,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $203,444

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 3.3125: Use distillation, evaporation to remove contaminants $43,625 $44,730 - $43,625
-
Tgal
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,594 - $4,594
49,531
kWh
- - -
03 2.7135: Install occupancy sensors $4,561 $3,300 $4,561
62,134
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $149,760 $280,000 - - - $149,760
05 3.1111: Cover ink containers when not in use $49,090 $5,700 - - $49,090
-
gal
-
TOTAL RECOMMENDED $251,630 $333,730 $9,155
111,665
kWh
$43,625
-
Tgal
$49,090
-
gal
$149,760
TOTAL IMPLEMENTED $203,444 $285,700 $4,594
49,531
kWh
- $49,090
-
gal
$149,760
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs