ITAC Assessment: OK0557
ITAC logo
ITAC Assessment: OK0557
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Trailers
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 3,200
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,361 613,130
kWh
Electricity Demand $12,597 -
Natural Gas $9,840 2,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $956 $2,140 $956
35,170
kWh
- - -
02 2.3137: Use power during off-peak periods $15,633 - $8,110
169,402
kWh
$7,523
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $715 $250 $715
26,377
kWh
- - -
04 2.8123: Pay utility bills on time $656 - $656
13,775
kWh
- - -
05 3.1191: Change procedures / equipment / operating conditions $20,969 $50,000 - - $20,969
-
lb
-
06 4.513: Re-arrange equipment layout to reduce labor costs $41,600 $260,000 - - - $41,600
TOTAL RECOMMENDED $80,529 $312,390 $10,437
244,724
kWh
$7,523
-
kW-mo/yr
$20,969
-
lb
$41,600
TOTAL IMPLEMENTED $38,929 $52,390 $10,437
244,724
kWh
$7,523
-
kW-mo/yr
$20,969
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs