ITAC Assessment: OK0551
ITAC logo
ITAC Assessment: OK0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Foam for furniture and bedding
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 250,000
ft2
Annual Production 10,300
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,922 1,498,828
kWh
Electricity Demand $31,289 -
Electricity Fees $1,461 -
Natural Gas $58,806 11,040
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.652: Replace existing equipment with more suitable substitutes $898 $80,000 $383
15,533
kWh
$515
-
kW-mo/yr
- -
02 4.211: Consider use / purchase of bulk materials where possible $29,885 - - - - $29,885
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,224 $9,700 - - $2,224
-
lb
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,304 - - $4,304
-
kW-mo/yr
- -
05 2.8121: Apply for tax-free status for energy purchases $2,522 - - - - $2,522
TOTAL RECOMMENDED $39,833 $89,700 $383
15,533
kWh
$4,819
-
kW-mo/yr
$2,224
-
lb
$32,407
TOTAL IMPLEMENTED $7,724 $80,000 $383
15,533
kWh
$4,819
-
kW-mo/yr
- $2,522
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs