Assessment Year | 1998 |
---|---|
Principal Product | Spring / frame for furniture |
NAICS |
n/a
|
SIC | 3495: Wire Springs |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
230,000
ft2
|
Annual Production | 24,000,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,729 | 3,468,933 |
kWh
|
$0.025 |
Electricity Demand | $31,289 | - |
|
- |
Electricity Fees | $(-3,424.0) | - |
|
- |
Natural Gas | $195,705 | 36,452 |
MMBtu
|
$5.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $170,425 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,124 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $100,207 | - | - | - | - | - | - | $100,207 | |
02 | 2.5194: Redesign process | $26,768 | $20,000 | - | - | - | - | $26,768 | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $8,393 | $1,945 | - |
$(-4.0)
-
kW-mo/yr
|
$(-3.0) | - | $8,400 | - | |
04 | 2.8121: Apply for tax-free status for energy purchases | $4,343 | $4,000 | - | - | - | - | - | $4,343 | |
05 | 3.5316: Contract a wood pallet recycling company | $18,120 | - | - | - | - |
$18,120
-
lb
|
- | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,888 | $9,700 | - | - | - |
$3,888
-
lb
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,071 | $8,400 |
$3,786
153,283
kWh
|
$2,285
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.2437: Recover waste heat from equipment | $1,920 | $3,006 |
$1,920
214,830
kWh
|
- | - | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $518 | $1,610 |
$302
12,309
kWh
|
$216
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.2511: Insulate bare equipment | $197 | $134 |
$197
21,981
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $170,425 | $48,795 |
$6,205
402,403
kWh
|
$2,497
-
kW-mo/yr
|
$(-3.0) |
$22,008
-
lb
|
$35,168 | $104,550 | ||
TOTAL IMPLEMENTED | $37,124 | $14,479 |
$3,983
175,264
kWh
|
$2,281
-
kW-mo/yr
|
$(-3.0) |
$18,120
-
lb
|
$8,400 | $4,343 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs