| Assessment Year | 1998 |
|---|---|
| Principal Product | Bread & Rolls |
| NAICS |
n/a
|
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
200,000
ft2
|
| Annual Production | 73,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $186,541 | 6,883,353 |
kWh
|
$0.027 |
| Electricity Demand | $129,979 | 14,490 |
kW-mo/yr
|
$8.97 |
| Electricity Fees | $2,683 | - |
|
- |
| Natural Gas | $177,722 | 51,288 |
MMBtu
|
$3.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,321 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,685 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.423: Move product using mechanical means | $15,431 | $20,000 |
$(-169.0)
(-6,155)
kWh
|
- | - | - | $15,600 | - | |
| 02 | 3.6122: Install solid waste incinerator for heat | $10,400 | $7,900 | - | - | - |
$10,400
-
lb
|
- | - | |
| 03 | 4.213: Purchase material from supplier in customized packaging | $6,240 | - | - | - | - | - | $6,240 | - | |
| 04 | 2.2442: Preheat combustion air with waste heat | $5,243 | $15,100 |
$(-757.0)
(-27,843)
kWh
|
- |
$6,000
-
MMBtu
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,438 | $5,916 |
$1,593
58,910
kWh
|
$845
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,273 | $2,460 |
$1,484
54,807
kWh
|
$789
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.1231: Establish burner maintenance schedule for boilers | $1,398 | $500 | - | - |
$1,398
-
MMBtu
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,395 | $4,626 |
$916
33,705
kWh
|
$486
-
kW-mo/yr
|
$(-150.0)
-
MMBtu
|
- | - | $143 | |
| 09 | 2.7135: Install occupancy sensors | $327 | $660 |
$327
12,016
kWh
|
- | - | - | - | - | |
| 10 | 2.2511: Insulate bare equipment | $176 | $542 | - | - |
$176
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $45,321 | $57,704 |
$3,394
125,440
kWh
|
$2,120
-
kW-mo/yr
|
$7,424
-
MMBtu
|
$10,400
-
lb
|
$21,840 | $143 | ||
| TOTAL IMPLEMENTED | $16,685 | $17,318 |
$3,077
113,717
kWh
|
$1,634
-
kW-mo/yr
|
$1,574
-
MMBtu
|
$10,400
-
lb
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs