ITAC Assessment: OK0546
ITAC logo
ITAC Assessment: OK0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Bread & Rolls
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 200,000
ft2
Annual Production 73,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,541 6,883,353
kWh
Electricity Demand $129,979 14,490
kW-mo/yr
Electricity Fees $2,683 -
Natural Gas $177,722 51,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.423: Move product using mechanical means $15,431 $20,000 $(-169.0)
(-6,155)
kWh
- - - $15,600 -
02 3.6122: Install solid waste incinerator for heat $10,400 $7,900 - - - $10,400
-
lb
- -
03 4.213: Purchase material from supplier in customized packaging $6,240 - - - - - $6,240 -
04 2.2442: Preheat combustion air with waste heat $5,243 $15,100 $(-757.0)
(-27,843)
kWh
- $6,000
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,438 $5,916 $1,593
58,910
kWh
$845
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,273 $2,460 $1,484
54,807
kWh
$789
-
kW-mo/yr
- - - -
07 2.1231: Establish burner maintenance schedule for boilers $1,398 $500 - - $1,398
-
MMBtu
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,395 $4,626 $916
33,705
kWh
$486
-
kW-mo/yr
$(-150.0)
-
MMBtu
- - $143
09 2.7135: Install occupancy sensors $327 $660 $327
12,016
kWh
- - - - -
10 2.2511: Insulate bare equipment $176 $542 - - $176
-
MMBtu
- - -
TOTAL RECOMMENDED $45,321 $57,704 $3,394
125,440
kWh
$2,120
-
kW-mo/yr
$7,424
-
MMBtu
$10,400
-
lb
$21,840 $143
TOTAL IMPLEMENTED $16,685 $17,318 $3,077
113,717
kWh
$1,634
-
kW-mo/yr
$1,574
-
MMBtu
$10,400
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs