ITAC Assessment: OK0544
ITAC logo
ITAC Assessment: OK0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Computers
NAICS
n/a
SIC 3572: Computer Storage Devices
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 150,000
ft2
Annual Production 140,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,316 5,555,979
kWh
Electricity Demand $121,457 12,783
kW-mo/yr
Natural Gas $107,257 27,753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7241: Install outside air damper / economizer on hvac unit $4,481 $320 - - $4,481
-
MMBtu
- - -
02 2.7135: Install occupancy sensors $1,223 $837 $1,223
45,135
kWh
- - - - -
03 2.7111: Reduce illumination to minimum necessary levels $846 $300 $456
16,706
kWh
$208
-
kW-mo/yr
- - $182 -
04 2.4221: Install compressor air intakes in coolest locations $728 $548 $445
16,413
kWh
$283
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $196 $329 $86
3,224
kWh
$130
-
kW-mo/yr
- - - $(-20.0)
06 4.321: Optimize production lot sizes and inventories $50,125 $39,400 - - - - $50,125 -
07 4.321: Optimize production lot sizes and inventories $6,348 - - - - - $6,348 -
08 3.5313: Increase amount of waste recovered for resale $160 - - - - $160
-
lb
- -
TOTAL RECOMMENDED $64,107 $41,734 $2,210
81,478
kWh
$621
-
kW-mo/yr
$4,481
-
MMBtu
$160
-
lb
$56,655 $(-20.0)
TOTAL IMPLEMENTED $54,962 $40,049 $86
3,224
kWh
$130
-
kW-mo/yr
$4,481
-
MMBtu
$160
-
lb
$50,125 $(-20.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs