Assessment Year | 1998 |
---|---|
Principal Product | Frozen dough and apple pies |
NAICS |
n/a
|
SIC | 2045: Prepared Flour Mixes and Doughs |
Sales Range | $100 M to 500M |
# of Employees | 160 |
Plant Area |
83,554
ft2
|
Annual Production | 411,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $296,009 | 12,531,360 |
kWh
|
$0.024 |
Electricity Demand | $191,129 | 25,903 |
kW-mo/yr
|
$7.38 |
Electricity Fees | $3,205 | - |
|
- |
Natural Gas | $13,195 | 3,003 |
MMBtu
|
$4.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $611,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $587,623 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,341 | $3,402 |
$(-457.0)
(-15,533)
kWh
|
$(-214.0)
-
kW-mo/yr
|
- | - | $13,100 | $(-88.0) | |
02 | 2.7144: Install spectral reflectors / delamp | $3,965 | $200 |
$3,170
107,562
kWh
|
$795
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,150 | $1,450 |
$289
9,672
kWh
|
$97
-
kW-mo/yr
|
- | - | - | $764 | |
04 | 2.3132: Recharge batteries on during off-peak demand periods | $726 | $440 | - |
$726
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $401 | $1,840 |
$288
9,672
kWh
|
$150
-
kW-mo/yr
|
- | - | - | $(-37.0) | |
06 | 2.7135: Install occupancy sensors | $155 | $396 |
$155
5,275
kWh
|
- | - | - | - | - | |
07 | 4.441: Install automatic packing equipment | $574,000 | $2,300,000 | - | - | - | - | $574,000 | - | |
08 | 3.3122: Use filtration, centrifuging to remove contaminants | $18,646 | $50,200 | - | - |
$(-54.0)
-
Tgal
|
$24,000
-
lb
|
$(-5,300.0) | - | |
TOTAL RECOMMENDED | $611,384 | $2,357,928 |
$3,445
116,648
kWh
|
$1,554
-
kW-mo/yr
|
$(-54.0)
-
Tgal
|
$24,000
-
lb
|
$581,800 | $639 | ||
TOTAL IMPLEMENTED | $587,623 | $2,306,078 |
$(-14.0)
(-586)
kWh
|
$662
-
kW-mo/yr
|
- | - | $587,100 | $(-125.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs