ITAC Assessment: OK0539
ITAC logo
ITAC Assessment: OK0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Thermoset plastics, Thermal plastics, and rubber products
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 150,000
ft2
Annual Production 400,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,767 3,754,689
kWh
Electricity Demand $82,066 -
Electricity Fees $(-30,588.0) -
Natural Gas $170,928 47,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $142,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $33,669 $117,000 $20,709
1,463,658
kWh
$12,960
-
kW-mo/yr
- - - - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $9,052 $15,600 - - $9,052
-
MMBtu
- - - -
03 2.2442: Preheat combustion air with waste heat $1,678 $5,722 $1,678
107,562
kWh
- - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $949 $90 $949
32,239
kWh
- - - - - -
05 3.5111: Filter and reuse hydraulic oil $6,430 $18,790 - - - - $6,430
-
gal
- -
06 3.4155: Meter waste water $885 - - - - $885
-
Tgal
- - -
07 4.213: Purchase material from supplier in customized packaging $69,300 - - - - - - - $69,300
08 4.423: Move product using mechanical means $20,600 $14,000 - - - - - $20,600 -
TOTAL RECOMMENDED $142,563 $171,202 $23,336
1,603,459
kWh
$12,960
-
kW-mo/yr
$9,052
-
MMBtu
$885
-
Tgal
$6,430
-
gal
$20,600 $69,300
TOTAL IMPLEMENTED $78,352 $15,600 - - $9,052
-
MMBtu
- - - $69,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs