ITAC Assessment: OK0529
ITAC logo
ITAC Assessment: OK0529
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Custom-made Motor Coaches
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 200,000
ft2
Annual Production 36
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,367 815,944
kWh
Electricity Demand $15,886 3,229
kW-mo/yr
Natural Gas $33,903 8,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,736

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.311: Schedule deliveries according to demand $37,800 $20,000 - - - - - - $37,800
02 2.8114: Change rate schedules or other changes in utility service $7,974 $7,000 - - $7,974 - - - -
03 3.3125: Use distillation, evaporation to remove contaminants $6,792 $22,365 - - - - $6,792
-
gal
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,030 $4,595 $3,230
98,769
kWh
$800
-
kW-mo/yr
- - - - -
05 2.7314: Reduce ventilation air $1,370 $5,600 $1,370
41,911
kWh
- - - - - -
06 3.5248: Separate and recycle scrap metal to foundry or for sale $770 - - - - - - $770
-
lb
-
07 2.2437: Recover waste heat from equipment $499 $1,086 - - - $499
-
MMBtu
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $207 $1,440 $174
5,275
kWh
$33
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $59,442 $62,086 $4,774
145,955
kWh
$833
-
kW-mo/yr
$7,974 $499
-
MMBtu
$6,792
-
gal
$770
-
lb
$37,800
TOTAL IMPLEMENTED $4,736 $7,121 $3,404
104,044
kWh
$833
-
kW-mo/yr
- $499
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs