Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Potato salad/ Baked beans
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 18,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,454 3,155,920
kWh
Electricity Demand $45,069 8,514
kW-mo/yr
Electricity Fees $924 -
Natural Gas $82,223 27,666
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,718

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2425: Use flue gases to heat process or service water $17,998 $48,754 - - $17,998
-
MMBtu
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,011 $3,500 - - $6,011
-
MMBtu
- -
03 2.2422: Use waste heat from hot flue gases to generate steam $3,099 $4,655 $(-135.0)
(-4,689)
kWh
- $3,234
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $962 $114 $744
25,791
kWh
$218
-
kW-mo/yr
- - -
05 2.2515: Use optimum thickness insulation $747 $166 - - $747
-
MMBtu
- -
06 3.5248: Separate and recycle scrap metal to foundry or for sale $6,149 $12,500 - - - $6,149
-
lb
-
07 4.423: Move product using mechanical means $39,936 $28,000 - - - - $39,936
TOTAL RECOMMENDED $74,902 $97,689 $609
21,102
kWh
$218
-
kW-mo/yr
$27,990
-
MMBtu
$6,149
-
lb
$39,936
TOTAL IMPLEMENTED $25,718 $52,534 $744
25,791
kWh
$218
-
kW-mo/yr
$24,756
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs