ITAC Assessment: OK0518
ITAC logo
ITAC Assessment: OK0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Cut up poultry
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 1,100
Plant Area 165,000
ft2
Annual Production 265,000,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $725,521 28,991,794
kWh
Electricity Demand $200,187 24,360
kW-mo/yr
Natural Gas $279,016 92,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,289

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,774 $17,415 $2,567
102,579
kWh
$1,294
-
kW-mo/yr
- - $(-87.0)
02 2.1231: Establish burner maintenance schedule for boilers $7,965 $5,000 - - $7,965
-
MMBtu
- -
03 2.2414: Use waste heat from hot flue gases to preheat $6,577 $8,566 - - $6,577
-
MMBtu
- -
04 4.513: Re-arrange equipment layout to reduce labor costs $3,330 - - - - - $3,330
05 3.4151: Minimize water usage $47,695 $7,520 - - - $47,695
-
Tgal
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,220 $2,561 $2,194
87,632
kWh
- $(-974.0)
-
MMBtu
- -
TOTAL RECOMMENDED $70,561 $41,062 $4,761
190,211
kWh
$1,294
-
kW-mo/yr
$13,568
-
MMBtu
$47,695
-
Tgal
$3,243
TOTAL IMPLEMENTED $16,289 $24,976 $4,761
190,211
kWh
$1,294
-
kW-mo/yr
$6,991
-
MMBtu
- $3,243
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs