ITAC Assessment: OK0515
ITAC logo
ITAC Assessment: OK0515
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Ceramic Fiber Blanket
NAICS
n/a
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 60,000
ft2
Annual Production 5,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,629 12,349,942
kWh
Electricity Demand $184,460 19,203
kW-mo/yr
Natural Gas $44,927 14,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,755

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.1191: Change procedures / equipment / operating conditions $2,700 $150 - - - - $2,700
-
lb
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $924 - $496
32,825
kWh
$428
-
kW-mo/yr
- - - -
03 3.3133: Use other waste concentration methods $1,080 $1,530 - - - $1,080
-
gal
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,757 $10,246 $1,487
97,890
kWh
$1,270
-
kW-mo/yr
- - - -
05 4.432: Cross-train personnel to avoid lost time $26,000 - - - - - - $26,000
06 2.2442: Preheat combustion air with waste heat $5,294 $12,700 - - $5,294
-
MMBtu
- - -
07 4.621: Use fixtures to reduce machine changeout times $6,825 $50 - - - - - $6,825
TOTAL RECOMMENDED $45,580 $24,676 $1,983
130,715
kWh
$1,698
-
kW-mo/yr
$5,294
-
MMBtu
$1,080
-
gal
$2,700
-
lb
$32,825
TOTAL IMPLEMENTED $38,755 $24,626 $1,983
130,715
kWh
$1,698
-
kW-mo/yr
$5,294
-
MMBtu
$1,080
-
gal
$2,700
-
lb
$26,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs