Assessment Year | 1996 |
---|---|
Principal Product | Custom plastic injection molding |
NAICS |
n/a
|
SIC | 3079: |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
900,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,036 | 4,739,742 |
kWh
|
$0.018 |
Electricity Demand | $110,662 | 9,786 |
kW-mo/yr
|
$11.31 |
Electricity Fees | $3,949 | - |
|
- |
Natural Gas | $8,518 | 1,522 |
MMBtu
|
$5.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,169 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,070 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 3.5311: Recover and reuse waste material | $1,551 | $800 | - | - |
$1,551
-
gal
|
|
02 | 2.3212: Optimize plant power factor | $16,093 | $5,400 | - |
$16,093
-
kW-mo/yr
|
- | |
03 | 2.6218: Turn off equipment when not in use | $5,977 | $1,952 |
$5,977
324,736
kWh
|
- | - | |
04 | 2.2624: Use cold waste water to cool chiller feed water | $1,670 | $6,000 |
$967
52,462
kWh
|
$703
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $464 | $2,440 |
$464
25,205
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $414 | $1,875 |
$414
22,567
kWh
|
- | - | |
TOTAL RECOMMENDED | $26,169 | $18,467 |
$7,822
424,970
kWh
|
$16,796
-
kW-mo/yr
|
$1,551
-
gal
|
||
TOTAL IMPLEMENTED | $22,070 | $7,352 |
$5,977
324,736
kWh
|
$16,093
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs