ITAC Assessment: OK0504
ITAC logo
ITAC Assessment: OK0504
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Custom plastic injection molding
NAICS
n/a
SIC 3079:
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 900,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,036 4,739,742
kWh
Electricity Demand $110,662 9,786
kW-mo/yr
Electricity Fees $3,949 -
Natural Gas $8,518 1,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
01 3.5311: Recover and reuse waste material $1,551 $800 - - $1,551
-
gal
02 2.3212: Optimize plant power factor $16,093 $5,400 - $16,093
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $5,977 $1,952 $5,977
324,736
kWh
- -
04 2.2624: Use cold waste water to cool chiller feed water $1,670 $6,000 $967
52,462
kWh
$703
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $464 $2,440 $464
25,205
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $414 $1,875 $414
22,567
kWh
- -
TOTAL RECOMMENDED $26,169 $18,467 $7,822
424,970
kWh
$16,796
-
kW-mo/yr
$1,551
-
gal
TOTAL IMPLEMENTED $22,070 $7,352 $5,977
324,736
kWh
$16,093
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs