ITAC Assessment: OK0503
ITAC logo
ITAC Assessment: OK0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Custom injection molding
NAICS
n/a
SIC 3079:
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 129,000
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,530 13,185,815
kWh
Electricity Demand $114,348 27,428
kW-mo/yr
Electricity Fees $38,293 -
Natural Gas $17,491 4,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
01 3.3126: Use absorption, extraction to remove contaminants $9,419 $800 - - $9,419
-
gal
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,600 - - $2,600
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,819 $10,000 $2,017
85,287
kWh
$802
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,213 $20,000 $2,346
99,355
kWh
$1,867
-
kW-mo/yr
-
05 2.7241: Install outside air damper / economizer on hvac unit $3,592 $54,000 $3,592
152,110
kWh
- -
TOTAL RECOMMENDED $22,643 $84,800 $7,955
336,752
kWh
$5,269
-
kW-mo/yr
$9,419
-
gal
TOTAL IMPLEMENTED $12,019 $800 - $2,600
-
kW-mo/yr
$9,419
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs