Assessment Year | 1996 |
---|---|
Principal Product | Custom injection molding |
NAICS |
n/a
|
SIC | 3079: |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
129,000
ft2
|
Annual Production | 24,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $241,530 | 13,185,815 |
kWh
|
$0.018 |
Electricity Demand | $114,348 | 27,428 |
kW-mo/yr
|
$4.17 |
Electricity Fees | $38,293 | - |
|
- |
Natural Gas | $17,491 | 4,623 |
MMBtu
|
$3.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,643 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,019 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 3.3126: Use absorption, extraction to remove contaminants | $9,419 | $800 | - | - |
$9,419
-
gal
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,600 | - | - |
$2,600
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,819 | $10,000 |
$2,017
85,287
kWh
|
$802
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,213 | $20,000 |
$2,346
99,355
kWh
|
$1,867
-
kW-mo/yr
|
- | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $3,592 | $54,000 |
$3,592
152,110
kWh
|
- | - | |
TOTAL RECOMMENDED | $22,643 | $84,800 |
$7,955
336,752
kWh
|
$5,269
-
kW-mo/yr
|
$9,419
-
gal
|
||
TOTAL IMPLEMENTED | $12,019 | $800 | - |
$2,600
-
kW-mo/yr
|
$9,419
-
gal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs