ITAC Assessment: GT0471
ITAC logo
ITAC Assessment: GT0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HARDWOOD LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 1,900
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,764 238,277
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $493 - $493
4,396
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $253 $150 $253
2,345
kWh
03 2.6212: Turn off equipment during breaks, reduce operating time $724 $200 $724
7,327
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $836 $1,510 $836
8,206
kWh
05 2.4133: Use most efficient type of electric motors $217 $10,400 $217
2,052
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $149 - $149
1,465
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $750 $2,210 $750
7,034
kWh
TOTAL RECOMMENDED $3,422 $14,470 $3,422
32,825
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs