Assessment Year | 1992 |
---|---|
Principal Product | HARDWOOD LUMBER |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
n/a
|
Annual Production | 1,900
thousand feet
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $24,764 | 238,277 |
kWh
|
$0.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,422 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $493 | - |
$493
4,396
kWh
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $253 | $150 |
$253
2,345
kWh
|
|
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $724 | $200 |
$724
7,327
kWh
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $836 | $1,510 |
$836
8,206
kWh
|
|
05 | 2.4133: Use most efficient type of electric motors | $217 | $10,400 |
$217
2,052
kWh
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $149 | - |
$149
1,465
kWh
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $750 | $2,210 |
$750
7,034
kWh
|
|
TOTAL RECOMMENDED | $3,422 | $14,470 |
$3,422
32,825
kWh
|
||
TOTAL IMPLEMENTED | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs